What was found
CLT - Q3 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOOR SUPPORT INTERCOSTAL BETWEEN BS 966 TO BS 986, RBL 16. REPLACED FLOOR SUPPORT INTERCOSTAL BETWEEN BS 966 TO BS 986, RBL 16 IAW BOEING DRAWING 65C31847.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q3 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOOR SUPPORT INTERCOSTAL BETWEEN BS 966 TO BS 986, RBL 16. REPLACED FLOOR SUPPORT INTERCOSTAL BETWEEN BS 966 TO BS 986, RBL 16 IAW BOEING DRAWING 65C31847.