What was found
CLT - Q3 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FORWARD & AFT SIDES OF FUSELAGE FRAME LEG AT BS 807, BL 0 TO LBL 6. REPAIRED FUSELAGE FRAME LEG AT BS 807, BL 0 TO LBL 6 IAW B737 SRM 53-00-07 REPAIR 4 & 53-00-10 REPAIR 19.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q3 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FORWARD & AFT SIDES OF FUSELAGE FRAME LEG AT BS 807, BL 0 TO LBL 6. REPAIRED FUSELAGE FRAME LEG AT BS 807, BL 0 TO LBL 6 IAW B737 SRM 53-00-07 REPAIR 4 & 53-00-10 REPAIR 19.