What was found
CLT - Q3 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOOR SUPPORT INTERCOSTAL AT BS 949 BETWEEN RBL 26 TO RBL 50. REPLACED FLOOR SUPPORT INTERCOSTAL AT BS 949 BETWEEN RBL 26 TO RBL 50 IAW B737 SRM 51-10-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q3 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOOR SUPPORT INTERCOSTAL AT BS 949 BETWEEN RBL 26 TO RBL 50. REPLACED FLOOR SUPPORT INTERCOSTAL AT BS 949 BETWEEN RBL 26 TO RBL 50 IAW B737 SRM 51-10-02.