What was found
CLT - MAJOR REPAIR - Q1 CHECK - LEVEL 2 EXFOLIATION CORROSION ON FRAME ATTACH FITTING AT BS 1006, BL 0 S26L - S26R. REPLACED FRAME ATTACH FITTING AT BS 1006, BL 0 S26L - S26R IAW B737 SRM 53-60-51.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - MAJOR REPAIR - Q1 CHECK - LEVEL 2 EXFOLIATION CORROSION ON FRAME ATTACH FITTING AT BS 1006, BL 0 S26L - S26R. REPLACED FRAME ATTACH FITTING AT BS 1006, BL 0 S26L - S26R IAW B737 SRM 53-60-51.