What was found
CLT - MAJOR REPAIR - Q1 CHECK - LEVEL 2 EXFOLIATION CORROSION ON SHEAR TIE AT BS 747, S27R. REPAIRED SHEAR TIE AT BS 747, S27R IAW B737 SRM 53-00-07.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - MAJOR REPAIR - Q1 CHECK - LEVEL 2 EXFOLIATION CORROSION ON SHEAR TIE AT BS 747, S27R. REPAIRED SHEAR TIE AT BS 747, S27R IAW B737 SRM 53-00-07.