What was found
CLT - Q1 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FUSELAGE FRAME SHEAR TIE AT BS 727G, S27R. REPLACED SHEAR TIE AT BS 727G, S27R IAW B737 SRM 53-00-07 R10.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q1 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FUSELAGE FRAME SHEAR TIE AT BS 727G, S27R. REPLACED SHEAR TIE AT BS 727G, S27R IAW B737 SRM 53-00-07 R10.