What was found
CLT - Q5 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOORBEAM UPPER T-CHORD AT BS 344, WL 208.1, BETWEEN LBL 20 AND RBL 20. REPLACED FLOORBEAM UPPER T-CHORD AT BS 344, WL 208.1, BETWEEN LBL 20 AND RBL 20 IAW B737 SRM 53-10-51 FIG 101, 51-20-01 AND 51-40-02.