What was found
CLT - Q5 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON INTERCOSTAL BETWEEN BS 927 TO BS 947.5, S21LL. REPLACED INTERCOSTAL BETWEEN BS 927 TO BS 947.5, S21L IAW BOEING DRAWING 65-52879.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q5 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON INTERCOSTAL BETWEEN BS 927 TO BS 947.5, S21LL. REPLACED INTERCOSTAL BETWEEN BS 927 TO BS 947.5, S21L IAW BOEING DRAWING 65-52879.