What was found
CLT - Q2 - MAJOR REPAIR - CRACK ON FUSELAGE FRAME AT BS 827 BETWEEN S8R TO S9R. REPAIRED FUSELAGE FRAME AT BS 827 BETWEEN S8R TO S9R IAW TYPICAL REPAIR 53-10-20E.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q2 - MAJOR REPAIR - CRACK ON FUSELAGE FRAME AT BS 827 BETWEEN S8R TO S9R. REPAIRED FUSELAGE FRAME AT BS 827 BETWEEN S8R TO S9R IAW TYPICAL REPAIR 53-10-20E.