What was found
CLT - Q2 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON INTERCOSTAL BETWEEN BS 967 TO BS 966, RBL 18. REPLACED INTERCOSTAL BETWEEN BS 967 TO BS 966, RBL 18 IAW B737 SRM 51-40-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q2 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON INTERCOSTAL BETWEEN BS 967 TO BS 966, RBL 18. REPLACED INTERCOSTAL BETWEEN BS 967 TO BS 966, RBL 18 IAW B737 SRM 51-40-02.