What was found
CLT - MAJOR REPAIR - Q1 CHECK - CRACKED GUSSET IN NLG WHEEL WELL CEILING AT BS 259. REPLACED GUSSET IN NLG WHEEL WELL CEILING AT BS 259 IAW BOEING DRAWING 65-45819.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - MAJOR REPAIR - Q1 CHECK - CRACKED GUSSET IN NLG WHEEL WELL CEILING AT BS 259. REPLACED GUSSET IN NLG WHEEL WELL CEILING AT BS 259 IAW BOEING DRAWING 65-45819.