What was found
CLT - Q5 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOORBEAM T-CAP AT BS 328 BETWEEN LBL 55 TO RBL 55. REPLACED FLOORBEAM T-CAP AT BS 328 BETWEEN LBL 55 TO RBL 55 IAW B737 SRM 53-10-51 & BOEING DRAWING 65-45812.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q5 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOORBEAM T-CAP AT BS 328 BETWEEN LBL 55 TO RBL 55. REPLACED FLOORBEAM T-CAP AT BS 328 BETWEEN LBL 55 TO RBL 55 IAW B737 SRM 53-10-51 & BOEING DRAWING 65-45812.