What was found
Q4 CHECK - LEVEL 2 EXFOLIATION CORROSION ON VERTICAL STIFFENER AT BS 1124 BETWEEN S13L TO S17L AT APU INLET CUTOUT (INSIDE TORQUE BOX). REPLACED VERTICAL STIFFENER IAW B737 SRM 51-40-02, 51-10-02 & BOEING DRAWING 65-46579.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
Q4 CHECK - LEVEL 2 EXFOLIATION CORROSION ON VERTICAL STIFFENER AT BS 1124 BETWEEN S13L TO S17L AT APU INLET CUTOUT (INSIDE TORQUE BOX). REPLACED VERTICAL STIFFENER IAW B737 SRM 51-40-02, 51-10-02 & BOEING DRAWING 65-46579.