What was found
BC1 CHECK - R2 DOOR SLIDE RAFT HITS ON FUSELAGE. REPACKED R2 DOOR SLIDE RAFT IAW CMM 25-61-20 REV 17 AND FOLDING / PROCEDURE P-11915 PERFORMED FINAL TEST AND TESTED OK.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BC1 CHECK - R2 DOOR SLIDE RAFT HITS ON FUSELAGE. REPACKED R2 DOOR SLIDE RAFT IAW CMM 25-61-20 REV 17 AND FOLDING / PROCEDURE P-11915 PERFORMED FINAL TEST AND TESTED OK.