What was found
C11 CHECK, EMER LIGHT AT 14C INOPERATIVE. RESEATED PIN B AT CONNECTOR 726VC6 IAW AMM 33-51-04 & REPLACED EMER POWER SUPPLY UNIT BWL AMM 33-51-38. OPERATIONS CHECKED GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
C11 CHECK, EMER LIGHT AT 14C INOPERATIVE. RESEATED PIN B AT CONNECTOR 726VC6 IAW AMM 33-51-04 & REPLACED EMER POWER SUPPLY UNIT BWL AMM 33-51-38. OPERATIONS CHECKED GOOD.