What was found
INT - DURING 'Q-3' CHECK VISUAL INSPECTION, FOUND .50 INCH BY 1 INCH CORRODED AREA AROUND CLIP NUT HOLES BL ZERO - RBL 45, BS 294.5 FLOOR BEAM UPPER T-CAP, BL ZERO TO RBL 45. REMOVED CORRODED SECTION FROM LBL 21 TO RT END. FABRICATED AND INSTALLED NEW T-CAP SECTION AND SPLICE ANGLES. REPAIRED PER SRM 53-10-51, FIGURE 205. CORROSION TASK NR: C53-107-02. CORROSION LEVEL: 2. (X)