What was found
PIT - DURING Q-3 CHECK INSPECTION, FOUND A 3 INCH CRACK AT STATION 885 RT CUSP MEMBRANE. STOP DRILLED CRACK AND INSTALLED DOUBLER REPAIR PER SRM 53-01 FIG 1 AND 2. (Z)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-3 CHECK INSPECTION, FOUND A 3 INCH CRACK AT STATION 885 RT CUSP MEMBRANE. STOP DRILLED CRACK AND INSTALLED DOUBLER REPAIR PER SRM 53-01 FIG 1 AND 2. (Z)