What was found
PIT - DURING Q-3 CHECK INSPECTION, FOUND 1.25 INCH CRACK AT STATION 906 RT CUSP MEMBRANE. STOP DRILLED CRACK AND INSTALLED DOUBLER REPAIR PER SRM 53-01 FIG 2. (Z)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-3 CHECK INSPECTION, FOUND 1.25 INCH CRACK AT STATION 906 RT CUSP MEMBRANE. STOP DRILLED CRACK AND INSTALLED DOUBLER REPAIR PER SRM 53-01 FIG 2. (Z)