What was found
PIT - DURING Q-4 CHECK, INSPECTION FOUND 1 INCH CRACK STA 1338 CENTER TOP OF AFT PASS DOCK IN STIFFENER. STOP DRILLED CRACK AND INSTALLED REPAIR ANGLE DOUBLERS PER SRM 53-01 FIG 2 SHEET 4. (W)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-4 CHECK, INSPECTION FOUND 1 INCH CRACK STA 1338 CENTER TOP OF AFT PASS DOCK IN STIFFENER. STOP DRILLED CRACK AND INSTALLED REPAIR ANGLE DOUBLERS PER SRM 53-01 FIG 2 SHEET 4. (W)