What was found
PIT - DURING Q-1 CHECK, INSPECTION FOUND .5 INCH CRACK IN STA 980 FRAME AT LONG 17L. ACCOMPLISHED SPLICE REPAIR PER SRM 53-03 FIG 32. (W)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-1 CHECK, INSPECTION FOUND .5 INCH CRACK IN STA 980 FRAME AT LONG 17L. ACCOMPLISHED SPLICE REPAIR PER SRM 53-03 FIG 32. (W)