What was found
PIT - DURING SCHEDULED Q-1 INSPECTION, FOUND 1 INCH CRACK IN VERTICAL STAB STATION ZFS 52.3 5TH RIB, CRACK AT SIDE END. INSTALLED DOUBLER REPAIR PER SRM 55-02 FIG 27. (W)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING SCHEDULED Q-1 INSPECTION, FOUND 1 INCH CRACK IN VERTICAL STAB STATION ZFS 52.3 5TH RIB, CRACK AT SIDE END. INSTALLED DOUBLER REPAIR PER SRM 55-02 FIG 27. (W)