What was found
GSO - DURING UNSCHEDULED MAINTENANCE VISUAL INSPECTION, FOUND 1.5 INCH CRACK, FORWARD END OF WEB AT THE NLG ACTUATOR SUPPORT FITTING BEAM AT STATION 227. REPAIRED PER EA 30088, SRM 51-40-2 FIG 1. (W)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
GSO - DURING UNSCHEDULED MAINTENANCE VISUAL INSPECTION, FOUND 1.5 INCH CRACK, FORWARD END OF WEB AT THE NLG ACTUATOR SUPPORT FITTING BEAM AT STATION 227. REPAIRED PER EA 30088, SRM 51-40-2 FIG 1. (W)