What was found
PIT - WHILE ACCOMPLISHING PRODUCTION CONTROL ITEM 949, FOUND A .5 INCH CRACK RADIALLY IN LONGERON 2R STATION 680 VISUAL INSPECTION. ACCOMPLISHED SPLICE REPAIR PER SRM53-02 FIG 2 AND USAIR TYPICAL REPAIR 53-10-17. (W)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - WHILE ACCOMPLISHING PRODUCTION CONTROL ITEM 949, FOUND A .5 INCH CRACK RADIALLY IN LONGERON 2R STATION 680 VISUAL INSPECTION. ACCOMPLISHED SPLICE REPAIR PER SRM53-02 FIG 2 AND USAIR TYPICAL REPAIR 53-10-17. (W)