What was found
PIT - DURING Q-5 CHECK INSPECTION, FOUND INTERCOSTAL AND DOUBLER MISDRILLED AT STA 886 AND STA 905, LONGERON 16L. FABRICATED AND HEAT TREATED NEW SECTION OF INTERCOSTAL AND INSTALLED DOUBLERS PER SRM 53-01, SRM 51-10-2A. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-5 CHECK INSPECTION, FOUND INTERCOSTAL AND DOUBLER MISDRILLED AT STA 886 AND STA 905, LONGERON 16L. FABRICATED AND HEAT TREATED NEW SECTION OF INTERCOSTAL AND INSTALLED DOUBLERS PER SRM 53-01, SRM 51-10-2A. (X)