What was found
PIT - DURING Q-1/CX-6 CHECK INSPECTION, FOUND LEVEL 1 CORROSION PREVIOUSLY REWORKED STATION 1300 TO 1338 LONGERON 29L. INSTALLED LONGERON SPLICE REPAIR PER SRM 53-02 FIG 14. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-1/CX-6 CHECK INSPECTION, FOUND LEVEL 1 CORROSION PREVIOUSLY REWORKED STATION 1300 TO 1338 LONGERON 29L. INSTALLED LONGERON SPLICE REPAIR PER SRM 53-02 FIG 14. (M)