What was found
INT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND .5 INCH DIAMETER AREA OF CORROSION STATION 294.5 FLOOR BEAM UPPER CHORD AT RBL 4. INSTALLED REPAIR ANGLES PER SRM 53-10-51 FIG 206. REPAIRED PER SRM 53-10-51, FIG 206. CORROSION TASK NR C53-107-02, CORROSION LEVEL 2. (M)