What was found
PIT - DURING Q-1 CHECK INSPECTION, FOUND LEVEL 1 CORROSION PREVIOUSLY REWORKED STATION 636 TO 731 LONGERON 28L TIE DOWN RAIL. MANUFACTURED NEW RAIL SECTION AND SPLICED PER SRM 53-05 4E AND DAC DWG SR09530082. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-1 CHECK INSPECTION, FOUND LEVEL 1 CORROSION PREVIOUSLY REWORKED STATION 636 TO 731 LONGERON 28L TIE DOWN RAIL. MANUFACTURED NEW RAIL SECTION AND SPLICED PER SRM 53-05 4E AND DAC DWG SR09530082. (M)