What was found
PIT - DURING Q1/C6 INSPECTION, FOUND LEVEL 1 CORROSION PREVIOUSLY REWORKED, LT AND RT FLOOR SUPPORT RAILS, STA 218 - STA 541, FORWARD CARGO, CORROSION TASK NR C51-5330. INSTALLED SPLICE REPAIR PER USAIR TYPICAL REPAIR 53-20-09A. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q1/C6 INSPECTION, FOUND LEVEL 1 CORROSION PREVIOUSLY REWORKED, LT AND RT FLOOR SUPPORT RAILS, STA 218 - STA 541, FORWARD CARGO, CORROSION TASK NR C51-5330. INSTALLED SPLICE REPAIR PER USAIR TYPICAL REPAIR 53-20-09A. (X)