What was found
CLT - INSPECTION VISUALLY FOUND A LEVEL 2 CORROSION, 3 INCHES BY 6 INCHES, LOCATED ON INTERCOSTAL AT S21L, BS 986.5 THROUGH BS 1006. FABRICATED AND INSTALLED NEW PARTS AS PER USAIR SRM 53-60-15, FIG 1 SHEET 4 DETAIL II-A. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - INSPECTION VISUALLY FOUND A LEVEL 2 CORROSION, 3 INCHES BY 6 INCHES, LOCATED ON INTERCOSTAL AT S21L, BS 986.5 THROUGH BS 1006. FABRICATED AND INSTALLED NEW PARTS AS PER USAIR SRM 53-60-15, FIG 1 SHEET 4 DETAIL II-A. (M)