What was found
INT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND .5 INCH CRACK, 2 INCH CRACK, 1 INCH CRACK AND .5 INCH CRACK AT 178 BULKHEAD WEB AT LOWER LEFT RADAR DISH MOUNT. INSTALLED DOUBLER REPAIR, REPAIRED PER TR 53-10-11. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND .5 INCH CRACK, 2 INCH CRACK, 1 INCH CRACK AND .5 INCH CRACK AT 178 BULKHEAD WEB AT LOWER LEFT RADAR DISH MOUNT. INSTALLED DOUBLER REPAIR, REPAIRED PER TR 53-10-11. (M)