What was found
INT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND ONE .25 INCH CRACK BS 520 AT RBL 25 CABIN FLOOR BEAM. INSTALLED NEW CHANNELS AND DOUBLERS PER EA 41421. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND ONE .25 INCH CRACK BS 520 AT RBL 25 CABIN FLOOR BEAM. INSTALLED NEW CHANNELS AND DOUBLERS PER EA 41421. (M)