What was found
CLT - DURING C-1 CHECK VISUAL INSPECTION, FOUND 1 INCH BY 1 INCH CORRODED AREAS STATION 1664 FLOOR BEAM. REPLACED UPPER CHORD SECTION, REPAIRED PER SRM 53-00-51, AND SRM 53-00-01. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING C-1 CHECK VISUAL INSPECTION, FOUND 1 INCH BY 1 INCH CORRODED AREAS STATION 1664 FLOOR BEAM. REPLACED UPPER CHORD SECTION, REPAIRED PER SRM 53-00-51, AND SRM 53-00-01. (M)