What was found
CLT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND 2 INCH CRACK BS 616 AT CREASE BEAM INTERSECTION (RT) RBBL 70 CREASE BEAM SHEAR WEB. INSTALLED REPAIR SECTION SRM 51-10-12. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND 2 INCH CRACK BS 616 AT CREASE BEAM INTERSECTION (RT) RBBL 70 CREASE BEAM SHEAR WEB. INSTALLED REPAIR SECTION SRM 51-10-12. (M)