What was found
CLT - DURING CHECK VISUAL INSPECTION, FOUND A 2.5 INCH SKIN CRACK AT THE KEEL BEAM STATION 698. INSTALLED TEMP REPAIR WITH BLIND FASTENERS PER BOEING REPAIR DOCUMENT SRM 53-60-12. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING CHECK VISUAL INSPECTION, FOUND A 2.5 INCH SKIN CRACK AT THE KEEL BEAM STATION 698. INSTALLED TEMP REPAIR WITH BLIND FASTENERS PER BOEING REPAIR DOCUMENT SRM 53-60-12. (M)