What was found
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A 1 INCH BY .5 INCH CORROSION ON FLOORBEAM AT STATION 986.5 LBL 27 AND LBL 30. CORROSION TASK NR C53-107-02. INSTALLED DOUBLERS PER REPAIR DOCUMENT T/R 53-10-05. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A 1 INCH BY .5 INCH CORROSION ON FLOORBEAM AT STATION 986.5 LBL 27 AND LBL 30. CORROSION TASK NR C53-107-02. INSTALLED DOUBLERS PER REPAIR DOCUMENT T/R 53-10-05. (M)