What was found
CLT - DURING Q-6 VISUAL INSPECTION, FOUND A CORRODED AREA OF 6 INCH BY 3 INCH STA 947 BL ZERO ON FLOOR BEAM. CORROSION TASK NR C53-107-02. INSTALLED DOUBLER ON FLOOR BEAM 947 LBL 8- RBL 8 PER SRM 53-00-51. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-6 VISUAL INSPECTION, FOUND A CORRODED AREA OF 6 INCH BY 3 INCH STA 947 BL ZERO ON FLOOR BEAM. CORROSION TASK NR C53-107-02. INSTALLED DOUBLER ON FLOOR BEAM 947 LBL 8- RBL 8 PER SRM 53-00-51. (X)