What was found
CLT - DURING C-1 CHECK VISUAL INSPECTION, FOUND INTERCOSTAL CORROSION AT RBL 60 STATION 365-395 CREASE BEAM INNER CHORD. REPLACED ONE-THIRD CHORD PER REPAIR DOCUMENT SRM 53-10-51. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING C-1 CHECK VISUAL INSPECTION, FOUND INTERCOSTAL CORROSION AT RBL 60 STATION 365-395 CREASE BEAM INNER CHORD. REPLACED ONE-THIRD CHORD PER REPAIR DOCUMENT SRM 53-10-51. (M)