As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
CLT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND AN AREA OF CORROSION AROUND FASTENERS .5 INCH BY .5 INCH BY 37 INCH STAITON 312 BETWEEN LBL 14 AND RBL 23 FLOORBEAM UPPER CHORD. CORROSION TASK NR C53-107-02. INSTALLED NEW T-SECTION WITH DOUBLER PER SRM 53-10-51. (M)