What was found
CLT - DURING Q2 CHECK VISUAL INSPECTION, FOUND SEVERAL 1 INCH BY 1 INCH AREAS OF CORROSION STATION 967 BETWEEN LBL 20 AND RBL 30 WL 208 FLOORBEAM. CORROSION TASK NR C53-107-02. INSTALLED DOUBLER PER BOEING 737-400 SRM 53-30-51. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q2 CHECK VISUAL INSPECTION, FOUND SEVERAL 1 INCH BY 1 INCH AREAS OF CORROSION STATION 967 BETWEEN LBL 20 AND RBL 30 WL 208 FLOORBEAM. CORROSION TASK NR C53-107-02. INSTALLED DOUBLER PER BOEING 737-400 SRM 53-30-51. (M)