What was found
CLT - DURING A Q-3 CHECK VISUAL INSPECTION, FOUND A 1.625 INCH CRACK STATION 520, RBL 45, WL 207 FLOORBEAM. INSTALLED DOUBLER PER EA 63061. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING A Q-3 CHECK VISUAL INSPECTION, FOUND A 1.625 INCH CRACK STATION 520, RBL 45, WL 207 FLOORBEAM. INSTALLED DOUBLER PER EA 63061. (M)