What was found
CLT - DURING A Q-1 CHECK VISUAL INSPECTION, FOUND CORROSION 88 INCH BY 1 INCH BS 1016 RBL 6 FLOORBEAM, CORROSION TASK NR C53-107-02. T-CAP FLOORBEAM REPLACED PER TR 53-10-05. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING A Q-1 CHECK VISUAL INSPECTION, FOUND CORROSION 88 INCH BY 1 INCH BS 1016 RBL 6 FLOORBEAM, CORROSION TASK NR C53-107-02. T-CAP FLOORBEAM REPLACED PER TR 53-10-05. (M)