What was found
CLT - DURING Q-3 CHECK VISUAL INSPECTION, FOUND 1.25 INCH CRACK STATION 294 WL 209 RBL 56 WEB. INSTALLED DOUBLER PER BOEING 737-300 SRM 51-70-11. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-3 CHECK VISUAL INSPECTION, FOUND 1.25 INCH CRACK STATION 294 WL 209 RBL 56 WEB. INSTALLED DOUBLER PER BOEING 737-300 SRM 51-70-11. (M)