What was found
CLT - DURING C-4 CHECK VISUAL INSPECTION, FOUND CORROSION 2 INCH BY 10 FT TOP OF FLOORBEAM STATION 1660, CORROSION TASK NR C53-251-03. SPLICED IN NEW SECTION UPPER CHORD PER BOEING 757-200 SRM 53-00-51. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING C-4 CHECK VISUAL INSPECTION, FOUND CORROSION 2 INCH BY 10 FT TOP OF FLOORBEAM STATION 1660, CORROSION TASK NR C53-251-03. SPLICED IN NEW SECTION UPPER CHORD PER BOEING 757-200 SRM 53-00-51. (M)