What was found
PIT - DURING Q-1 CHECK, FOUND 1 INCH CRACK AT LONGERON 13R STATION 965. REMOVED CRACKED LONGERON SECTION, INSTALLED NEW SECTION WITH SPLICE PER SRM 53-02 FIG 18. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-1 CHECK, FOUND 1 INCH CRACK AT LONGERON 13R STATION 965. REMOVED CRACKED LONGERON SECTION, INSTALLED NEW SECTION WITH SPLICE PER SRM 53-02 FIG 18. (M)