What was found
PIT - DURING Q-1 CHECK, FOUND RIGHT LAV CENTER FLOOR SUPPORT CORRODED AND CRACKED .75 INCH AT STATION 965. CORROSION LEVEL 1, CORROSION TASK NR C58-5330. CLEANED CORROSION, TREATED AND PRIMED PER SRM. MANUFACTURED NEW FLOOR SUPPORT TAB FROM 7075-T6.040 PER SRM 51-10-03. (M)