What was found
CLT - DURING Q-3 CHECK VISUAL INSPECTION, FOUND A CRACK AT STATION 277 STRINGER 24L TIE CLIP. REPAIRED PER SRM 51-10-02. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-3 CHECK VISUAL INSPECTION, FOUND A CRACK AT STATION 277 STRINGER 24L TIE CLIP. REPAIRED PER SRM 51-10-02. (M)