What was found
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A 1 INCH BY 8 INCH AREA OF CORROSION AT BS 747 RBBL 13.8 FLOORBEAM. INSTALLED TIE DOWN TRACK PER SRM 53-00-53 FIG 202. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND A 1 INCH BY 8 INCH AREA OF CORROSION AT BS 747 RBBL 13.8 FLOORBEAM. INSTALLED TIE DOWN TRACK PER SRM 53-00-53 FIG 202. (M)