What was found
PIT - DURING Q-1 CHECK, FOUND 2 INCH CRACK AT STATION 965 LT CUSP MEMBRANE. ROUTED OUT CRACK AND INSTALLED DOUBLER PER EA (PENDING) 51752. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - DURING Q-1 CHECK, FOUND 2 INCH CRACK AT STATION 965 LT CUSP MEMBRANE. ROUTED OUT CRACK AND INSTALLED DOUBLER PER EA (PENDING) 51752. (M)