What was found
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND .5 INCH CRACK AT STATION 727D AT LBL 02 AND RBL 02 FRAME. INSTALLED DOUBLER AND FILLERS PER SRM 53-60-07 AND EA 64800. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND .5 INCH CRACK AT STATION 727D AT LBL 02 AND RBL 02 FRAME. INSTALLED DOUBLER AND FILLERS PER SRM 53-60-07 AND EA 64800. (M)