What was found
CLT - DURING A Q-1 CHECK VISUAL INSPECTION, FOUND A .25 INCH CRACK IN FUSELAGE FRAME AT FASTENER HOLE BS 400 BETWEEN STR 8R AND STR 9R. INSTALLED DOUBLER PER SRM 53-00-07. (X)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - DURING A Q-1 CHECK VISUAL INSPECTION, FOUND A .25 INCH CRACK IN FUSELAGE FRAME AT FASTENER HOLE BS 400 BETWEEN STR 8R AND STR 9R. INSTALLED DOUBLER PER SRM 53-00-07. (X)